About our experience

Here after are presented some of the projects Enersole founder and general manager has taken part into in the past 13 years.
They highlight his experience that can be found in his resume.
ENERSOLE will be providing similar services among others.

Experience in Power Systems engineering

Name of Project: De Groene Delta Wind Farm Project

Year: July 2020

Location: Belgium

Client: Engie

Main Project Features: 2 x 3.5 MW Wind Farm

Positions held: Power System Engineer

Activities performed: Grid compliance study of Nordex 2 x 3.5 windmills in the Belgian grid

Software used: Power Factory

Name of Project: Greater Banjul Modernization project

Year: September 2018

Location: Gambia

Client: National Water and Electricity Company Limited (NAWEC)

Main Project Features: 225 kV transmission line between Brikama and Kotu substations (32 km)

Positions held: Power system engineer

Activities performed: Power system analysis of the Gambia High Voltage transmission system through a load flow, short circuit currents and contingency analysis.

Software used: Power Factory

Name of Project: Souapiti Hydropower plant project

Year: June 2018

Location: Guinea (Conakry)

Client: Administration et Contrôle des Grands Projet et Marchés Publics (ACGPMP)

Main Project Features: Souapiti: 4 units, installed capacity of 4 x 112 MW,

Positions held: Power system engineer

Activities performed: Integration studies of the hydroelectric power plant of Souapiti in the interconnected electrical network of Guinea through a load flow, short circuit currents, contingency analysis and transient stability analysis Checking of the need of generators to operate as synchronous condensers.

Software used: Power Factory

Name of Project: Stability study of the Guinean power system

Year: May 2018

Location: Guinea (Conakry)

Client: Administration et Contrôle des Grands Projet et Marchés Publics (ACGPMP)

Main Project Features: Entire power system stability analysis

Positions held: Power system engineer

Activities performed: Checking of transient stability studies of the Guinean interconnected electrical network through a load flow, short circuit currents, contingency analysis and transient stability analysis

Software used: Power Factory

Experience in Electrical equipment studies

Name of Project: Tanjung Sakti HPP Project

Year: 2017

Location: Indonesia

Client: PT Indonesia Power

Main Project Features: hydroelectic power plant of 3 x 40 MW

Positions held: Project Engineer

Activities performed: Integration studies of Tanjung Sakti HPP: Design of HV transmission lines and switchyards, Power system analysis, Costs estimation of energy evacuation works

Name of Project: Nam Lik hydropower plant project

Year: 2017

Location: LAOS

Client: Nam Lik 1 Power Company

Main Project Features: 2 horizontal bulb turbines, installed capacity 2x32,5 MW

Positions held: Project Engineer

Activities performed: Review of earthing system calculation notes

Name of Project: Montagne d’Or transmission line project

Year: 2016

Location: FRENCH GUIANA

Client: Nord Gold

Main Project Features: 1 transmission line of 90kV, 120km (Citron – St Laurent du Maroni)

Positions held: Project Engineer

Activities performed: Prefeasibility and feasibility study of energy evacuation works with the electrical designing of transmission line (cross-section calculation under thermal, short-circuit, voltage drop and corona effect criterion, determination of economical cross-section)

Name of Project: Nam Theun hydropower plant project

Year: 2016

Location: LAOS

Client: Electricity Generating Public Company Limited (EGCO)

Main Project Features: 3 vertical Francis turbines, installed capacity 2x265 MW+1x133 MW

Positions held: Project Engineer

Activities performed: Due diligence related to the hydroelectric power plants energy evacuation works designing. Review of 500 kV and 115 kV switchyards and transmission lines design

Experience in Project management, Owner's assistance and Owner's engineering

Name of Project: Manantali hydropower plant project

Year: 2016 - 2017

Location: MALI

Client: Société de Gestion de l’Energie de Manantali (SOGEM)

Main Project Features: 5 vertical Kaplan turbines, installed capacity 5x40 MW

Positions held: Project Engineer

Activities performed: Supervision of overhaul and re-commissioning of units 1,2,4 and 5

Name of Project: Project of the Electricity Sector Strengthening in Ivory Coast (PRSECI) project

Year: March 2015

Location: IVORY COAST

Client: Société des Énergies de Côte d’Ivoire (CI-ENERGIES)

Main Project Features: Supervision and control of Ivory Coast electrical networks strengthening works

Positions held: Project Engineer

Activities performed: Owner’s Engineer:

Name of Project: DEVOLL hydropower plant project

Year: 2014

Location: ALBANIA

Client:: DEVOLL HYDROPOWER (TIRANA - ALBANIA)

Main Project Features: Installed capacity of 39 MW

Positions held: Project Engineer

Activities performed: Factory Acceptance tests on 220kV circuit breaker of Moglicë switchyard in Alstom grid’s factory in Villeurbanne in France

Name of Project: Kaleta hydropower plant project

Year: August 2012 - August 2013

Location: GUINEA CONAKRY

Client:: Administration et Control des Grands Projets (ACGP)

Main Project Features: 3 vertical Francis turbines, installed capacity of 3x70 MW

Positions held: Project Engineer

Activities performed : Technical assistance to the Client

  • Analysis and follow-up of the Contractor planning and billings
  • Review and monitoring of technical correspondence relating to the lines and stations and hydro-mechanical equipment
  • Drafting of briefs to aid decision making, mail projects, rendering accounts of meetings, mission reports
  • Organization and management of field missions
  • Service Staff Training
  • Experience in Asset management

    Name of Project: Mali Asset management Director

    Year: August 2020 - October 2021

    Location: Mali

    Client:: EDM S.A.

    Main Project Features:50 MWc photovoltaïc power plant in Kita generating around 80 GWh/year into the Malian national Grid

    Positions held: Director of the power plant Operation and Maintenance company (Akuo Mali Services)

    Activities performed:

  • Supervision, operation and maintenance of the power plant including performances calculations and follow up, supervision with the Scada system, Real time operation, daily, weekly, monthly and quarterly generation forecasting and reporting, diagnosis of equipment failures and planning of maintenance activities (preventive and corrective maintenance).
  • Management of Technical O&M team, Health, safety and Environmental aspects of the site, environmental and social compensation measures, safety and security of the staff, budget and finance control of the SPV, subcontractors contracting and follow up, relationship with local authorities, human resources management.
  • Let's talk about your needs